Saturday 12 February 2011

The sun came out and 30% and I got busy today.

TP was spending the day with his Mum so it was a quick trip to Tesco, Lunch and then a list of chores. The new light and switch were installed in TPs bathroom and, after the dogs were walked, the bathroom cabinet was put on the wall.

Floors were scrubbed and swept and the debris that accumulates during the week was cleared away. Nothing exciting just a long list of domestic duties but a sense of satisfaction at the end of the day that The Pile looks a little more "together".

Over the past few months we have been more focussed on the renovations and we have a Chippy coming over tomorrow to quote for a few tasks including a fitted wardrobe in our Bedroom and a cupboard on the Landing.

He is a very capable Carpenter and General Builder and was part of the Team that built the extension back in 2007/08. Due to the age of the Property and it's consequent irregularity he built the roof by hand on site. There were no pre built roof trusses to be craned in to place and each length of wood was individually cut to fit. He also laid the oak floor on the Landing so we know that his carpentry repertoire runs from structural to decorative.

 All we need to do now is "get our ducks in a row" so that Andy and Steve have replaced the Bedroom ceiling before Ian is ready to come in a build the wardrobe.

----------------------------

Other Stuff:

30%'s car came back from the local workshop. They had run a diagnostic test and no faults had come up and the damned thing started when they got it back to the workshop. It was fortunate that they tried to start it when they picked it up from home and it resolutely refused to fire up, otherwise we would have looked like a right pair of idiots. The fuel system has been checked and the filters replaced but nothing significant has come to light. It may have been contaminated fuel but they cannot be sure.  The Mechanic had come across this before in an Audi with the same engine and no cause could ever be identified. The engine type is normally very reliable so it is a case of fingers crossed that this is a "one off". Their advice was to join the AA and it if started to play up consider it time to get a replacement vehicle.

Work has started to ramp up as our prospective client has decided that they quite like the proposal that we have presented and we are through to the next stage. There will now be many weeks of discussion, debate and development of "numbers" hopefully followed by a similar amount of time devoted to Contractual debate before pen is put to paper.

No comments:

Post a Comment