… However it is this final entry on the list that made the day seem arduous and tiring. Basically, apart from meals and a walk with the dogs, I spent all day chemical stripping the frame of the floor to ceiling cupboard in the Hall. This involved covering a small area* with a home made, chemical gloop, waiting a few minutes and then rubbing vigorously with wire wool. The resulting slurry then needed to be washed off the wood with clean water and the wood surface was then neutralised with white vinegar.
I have made great progress. The eighteenth century oak, appearing from under the paint residue, looks fantastic but it is hard going. My fingers and shoulders are sore from my labours and I have another morning's work before I can strike this task from the "to do" list.
I was dreading this task from the start and procrastinated for a while before actually getting on with it. All I can say is "I'll be glad when this is over".**
---
* say about the size of an A4 sheet of paper** The Hall also features another large cupboard that looks to date from the 1940's or 50's and houses the electricity meter. The original plan was to strip that one too. This , however, has been revised as the frame and sides have been stained rather than painted and would never strip successfully. Plan B is that the doors will be natural wood and will sit in a tastefully painted carcass.
No comments:
Post a Comment
Hi, I
have no idea who reads this stuff, so it's really nice to get some feedback from whoever your are.
All the best
Badman