Wednesday, 14 September 2011

A dull day in the office.

Wednesday was spent at my nearest Circle of Hell in a series of meetings with Senior Members of the Account Team. They are a likeable bunch but it was a pretty tedious day.  I finally crawled away a little before six with a raft of documents to review and some "urgent" slides to prepare!

At home there had been some serious excavation work in preparation for the block paving. Our original ideas have been somewhat revised due to the location of a tree and changing levels but the cleared area gives an idea of the final shape and it is going to be so much better than the strip of 1950's concrete slabs which were very utilitarian and simply provided a way of walking around the house without getting your feet muddy.

No comments:

Post a Comment

Hi, I
have no idea who reads this stuff, so it's really nice to get some feedback from whoever your are.
All the best
Badman